Project Background:
New drop in liners panels had been proposed to be installed into HPGR wet screen bins. The existing 20mm bisalloy liners was to be left in the bin and the new liner panels would be installed over the top.
Each panel weighed 1.5T and 8 panels were tol be installed on the inner walls of each bin.
As requested by Anglogold, Yenem was to carry out structural integrity assessment of the HPGR wet screen bin.
Scope of Work
Our scope of work comprised carrying out structural integrity assessment of the HPGR wet screen feed bins with proposed liner loads
Limitations, assumptions, exclusions